Research on safety assessment and protection technology of joint construction of high voltage tower and 5g base station
编号:601 访问权限:仅限参会人 更新:2022-08-31 10:24:27 浏览:90次 张贴报告

报告开始:暂无开始时间(Asia/Shanghai)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

视频 无权播放 演示文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
Carrying out power tower sharing cooperation with the power grid is an effective way to solve the problem of base station site resources. However, the current sharing pilot and technical demonstration do not involve the high-voltage dangerous impact and protection under the condition of short- circuit fault, which undoubtedly lays a great potential safety hazard for the subsequent large-scale promotion and Application. Aiming at the power frequency ground potential rise when the high-voltage line is short circuited to the ground, this paper establishes the corresponding simulation model of the shared tower, completes the simulation calculation of the ground potential rise distribution of the ground network under different short-circuit currents and different earth resistivity, obtains the impact of the power frequency ground potential rise on the 5g base station through analysis and summary, and puts forward the overall safety protection construction scheme of the high-voltage power tower shared by
关键词
shared power tower; High voltage protection; Safety assessment
报告人
yifan hang
zhongxun

稿件作者
yifan hang zhongxun
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    09月25日

    2022

    09月29日

    2022

  • 08月15日 2022

    提前注册日期

  • 09月10日 2022

    报告提交截止日期

  • 11月10日 2022

    注册截止日期

  • 11月30日 2022

    初稿截稿日期

  • 11月30日 2022

    终稿截稿日期

主办单位
IEEE DEIS
承办单位
Chongqing University
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询