Influence of arc between rigid catenary and pantograph sliding plate on current during train operation
编号:589 访问权限:仅限参会人 更新:2022-08-29 16:22:33 浏览:86次 张贴报告

报告开始:暂无开始时间(Asia/Shanghai)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

演示文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
 The traction power supply system is an important part of the electrified railway, which transfers the electric energy of the power system to the electric locomotive to complete the traction operation. In this paper, the typical components of the traction power supply system are modeled by PSCAD/EMTDC, and the V/v connection traction transformer CRH3 traction power supply system is simulated and analyzed, and the self-impedance of the conductors combined and the self- and mutual impedance of the remaining conductors are obtained through circuit theory. and the accurate calculation method of the mutual impedance between the remaining conductors and the combined conductors, which provides accurate electrical parameters for building the simulation model of the traction network. Electrical analysis requirements for traction power supply systems. Steady-state and transient analysis of the electrified locomotive were carried out by using the established model, and two different arc black-box models were introduced to simulate and analyze the off-line overvoltage of the pantograph and catenary, and to study the factors and influences of prolonging the life of the pantograph and catenary.
关键词
Magnetohydrodynamics,Pantograph catenary system,Rigid catenary,Arc ablation
报告人
Yanjin Zhu
EAST CHINA JIAOTONG UNIVERSITY

稿件作者
Yanjin Zhu EAST CHINA JIAOTONG UNIVERSITY
Han Zeng East China Jiaotong University
Jialin Chen East China Jiaotong University
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    09月25日

    2022

    09月29日

    2022

  • 08月15日 2022

    提前注册日期

  • 09月10日 2022

    报告提交截止日期

  • 11月10日 2022

    注册截止日期

  • 11月30日 2022

    初稿截稿日期

  • 11月30日 2022

    终稿截稿日期

主办单位
IEEE DEIS
承办单位
Chongqing University
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询