This work of this paper is about a large crossing project with hybrid voltage , so there is no experience about it. Therefore,it is necessary to carry out special lightning protection research on the large crossing project to provide technical support for engineering design and construction.  It is obvious that the large crossing project has the characteristics of high tower, long span length, and hybrid voltage erection. Based on these factors, this paper uses ATP software to model the project and obtain the corresponding lightning withstand level and lightning shielding failure proof level. Subsequently, the shielding failure trip-out rates of the DC part and AC part of the AC / DC common-frame tower are obtained by the improved electro-geometrical model. According to the safety regulations of large crossing projects, this paper converts the counterattack trip-out rate and shielding failure trip-out rate to the safety years in order to pass assessment. At the same time, in the process of lightning protection calculation, considering the specialty of large crossing engineering, in order to ensure the safe of the project, this paper adopts lightning protection measures including but not limited to modifying the protection angle of lightning line or adding hanging arrester, and then calculates and analyzes its lightning protection effect for large crossing project.
关键词
safety years,transmission lines,electrical geometry model,shielding failure trip-out rate,large crossing
报告人
Haochen Zhang
WuHan University

稿件作者
Huan Jin China Electric Power Research Institute
Hongbing Shen China Electric Power Research Institute
Jiao Zhu State Grid Jiangsu Electric Power Company Construction Branch
Haochen Zhang WuHan University
Yeqiang Deng Wuhan University
Yu Wang Wuhan University
Dongyang Lin State Grid Jiangsu Electric Power Company Construction Branch
Zhangxuan Wang State Grid Jiangsu Electric Power Company Construction Branch
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    09月25日

    2022

    09月29日

    2022

  • 08月15日 2022

    提前注册日期

  • 09月10日 2022

    报告提交截止日期

  • 11月10日 2022

    注册截止日期

  • 11月30日 2022

    初稿截稿日期

  • 11月30日 2022

    终稿截稿日期

主办单位
IEEE DEIS
承办单位
Chongqing University
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询