Research on Overvoltage of Electric Phase Separation Repeated Arc Burning Based on Habedank Model
编号:462 访问权限:仅限参会人 更新:2022-09-11 16:23:22 浏览:48次 张贴报告

报告开始:暂无开始时间(Asia/Shanghai)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

视频 无权播放 演示文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
China's high-speed railway adopts a single-phase AC power supply system. In order to balance the three-phase load on the grid side, the railway traction power supply system sets up a phase-separated area every 30km for commutation power supply. At present, most of the phase-separated areas of China's railways use automatic power-off and over-power phase mode. Before the train enters the neutral section, it will receive a signal to automatically disconnect the on-board circuit breaker to cut off the connection between the catenary and the train load. When the train passes through the articulated electrical phase separation,after on-site observation, the voltage drop between the pantograph and the catenary will break down the air when the pantograph slides on the neutral line and begins to gradually separate from the left branch catenary, resulting in repeatedly burning pantograph arcs. Since the on-board circuit breaker has been opened, the high-voltage cables on the train have no load current. The current thr
关键词
repeated arc burning, distributed parameter line model, improved Habedank arc model
报告人
Xiangzhao He
China Railway Chengdu Bureau Group Co., Ltd

稿件作者
Xiangzhao He China Railway Chengdu Bureau Group Co., Ltd
Minghua Jian Southwest Jiaotong University
Lejia Liu Southwest Jiaotong University
Qi Fu China Railway Chengdu Bureau Group Co., Ltd
Yujing Liang Southwest Jiaotong University
Xiaobin Cao Southwest Jiaotong University
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    09月25日

    2022

    09月29日

    2022

  • 08月15日 2022

    提前注册日期

  • 09月10日 2022

    报告提交截止日期

  • 11月10日 2022

    注册截止日期

  • 11月30日 2022

    初稿截稿日期

  • 11月30日 2022

    终稿截稿日期

主办单位
IEEE DEIS
承办单位
Chongqing University
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询