Study on Valve Screwing technology for automatic Oil Extraction of Operating Transformer
编号:213 访问权限:仅限参会人 更新:2022-09-20 23:56:23 浏览:71次 口头报告

报告开始:暂无开始时间(Asia/Shanghai)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

演示文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
For operating oil-immersed transformer oil extraction problem, this paper takes the most widely used oil plug type oil ex-traction valve as the research object, and conducts a study on the mechanical screwing oil extraction technology required for unmanned oil extraction. It is found that the unscrewing of the oil extraction valve is mainly divided into three stages: locking, partial preload and slackening. The mechanical characteristics of the above three stages are analyzed in the paper, and it is found that the preload force and the resistance moment are mainly functions of the angular displacement. Through the engineering empirical formula, the active torque negative feedback control system is established to obtain a more ideal angular displacement-time curve, and the control curve of active torque with time is obtained based on simulation, which provides suggestions and guidance directions for the transformer un-manned oil extraction technology.
关键词
暂无
报告人
Zhuo Wei
China Electric Power Research Institute Co., Ltd

稿件作者
Gang Wu China Electric Power Research Institute Co., Ltd
Zhuo Wei China Electric Power Research Institute Co., Ltd
Yujia Gong China Electric Power Research Institute
Guotai Yang China Electric Power Research Institute Co., Ltd
Tian Yuan China Electric Power Research Institute Co., Ltd
Xiaona Hou China Electric Power Research Institute Co., Ltd
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    09月25日

    2022

    09月29日

    2022

  • 08月15日 2022

    提前注册日期

  • 09月10日 2022

    报告提交截止日期

  • 11月10日 2022

    注册截止日期

  • 11月30日 2022

    初稿截稿日期

  • 11月30日 2022

    终稿截稿日期

主办单位
IEEE DEIS
承办单位
Chongqing University
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询