摘要清单
我的稿件
650
Research on Live Working Safety of 110kV and 220kV Mixed Lines Based on Vertical Lifting Method终稿

Delong Cai*

#14. High Voltage Apparatus: Reliability and Maintenance

647
Research on formula of ZnO varistor with optimized impulse aging performance终稿

Zihao Liu*, Xuesong Du, Shuai Wan, Wei Cao, Zhikai Wang, Hanchao Chen

#14. High Voltage Apparatus: Reliability and Maintenance

646
Analysis of multiple valve units steep front impulse voltage test of HVDC thyristor valve终稿

Liu Chen*, SHEN Meng, YUAN Ni

#14. High Voltage Apparatus: Reliability and Maintenance

631
MMC Power Device Loss and Junction Temperature Calculation Considering Junction Temperature Feedback终稿

Weirong Qian, Rongliang Zheng*, Youyuan Wang, Li Liu, Enke Yu

#14. High Voltage Apparatus: Reliability and Maintenance

597
Study on Temperature Rise Characteristics of Insulated Jumper Clamp in 10 kV Distribution Line终稿

吴 田*, 王 南极

#14. High Voltage Apparatus: Reliability and Maintenance

594
Research on Fault Simulation of Hydraulic Spring Circuit Breaker in Low Temperature Environment终稿

Fuxing Yang, Yifan Fu, Zhiming Zheng, Xinming Ma, Minjun Zhang, Minfu Liao*, Hui Ma

#14. High Voltage Apparatus: Reliability and Maintenance

569
Remaining Life Estimation of Power Transformer Based on Wiener Process and Reliability Model终稿

Jun Jiang*, Yuncai Lu, Bo Li, Chao Wei, Chaohai Zhang

#14. High Voltage Apparatus: Reliability and Maintenance

561
Stability Analysis of UHV Converter Transformer Winding Under Short-circuit Force终稿

Jian Zhang*, 书琦 张, Huanchao Cheng, Yikun Zhao, Jinzhong Li, Gang Li, 晓林 赵

#14. High Voltage Apparatus: Reliability and Maintenance

551
Research on bird droppings flashover of 110kV transmission line composite insulator insulation-coated grading ring终稿

Jinpeng Hao*, Hong Wu, Zhaoguo Xu, Yuyao Hu, Xiuguang Li

#14. High Voltage Apparatus: Reliability and Maintenance

544
Remaining Life Prediction of Power Transformers Based on Data Fusion and Wiener Model终稿

Jun Jiang*, Wenqian Zhang, Zhang Chaohai, Bo Li, Yuncai Lu, Jiansheng Li

#14. High Voltage Apparatus: Reliability and Maintenance

535
Optimized Arrangement of Cables in Cable Tunnel of Substation Considering Fireproof Performance终稿

宇 田, 建锋 梁, 刚铎 封*

#14. High Voltage Apparatus: Reliability and Maintenance

534
Temperature rise test and calculation method of liquid - immersed transformer终稿

Xueli Liu*, Jiantao Sun, Jianyi Wang

#14. High Voltage Apparatus: Reliability and Maintenance

503
Development and application of a primary and secondary fusion based intelligent GIS摘要录用

Xiaoxin Chen*

#14. High Voltage Apparatus: Reliability and Maintenance

501
A Novel High Voltage Solid-State Switch Based onThe SiC-MOSFET Series摘要录用

dazhao he, Wenjie Sun, Penghao Zhang, Yixin Liao, Liang Yu*, Chenguo Yao, Shoulong Dong

#14. High Voltage Apparatus: Reliability and Maintenance

493
A Novel VLF-Sin Voltage Generator for Diagnosis Testing in 10-kV Power Cables摘要录用

Li Wang, Hongjie Li*, Tingxi Sun, Weidong Ding, Hongxiao Wu, Baofeng Nan

#14. High Voltage Apparatus: Reliability and Maintenance

重要日期
  • 会议日期

    09月25日

    2022

    09月29日

    2022

  • 08月15日 2022

    提前注册日期

  • 09月10日 2022

    报告提交截止日期

  • 11月10日 2022

    注册截止日期

  • 11月30日 2022

    初稿截稿日期

  • 11月30日 2022

    终稿截稿日期

主办单位
IEEE DEIS
承办单位
Chongqing University
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询