65 / 2016-10-12 19:58:42
Calculation of contribution rate of construction technology progress based on Cobb-Douglas production function
Almon parameters estimation method, Cobb-Douglas production function, construction industry, significance test, technical progress contribution rate
摘要录用
徐徐树铭 / 华中科技大学
刘刘文 / 华中科技大学
周周炜 / 华中科技大学
唐唐菁菁 / 华中科技大学
赵赵挺生 / 华中科技大学
In order to adapt to the new normal economic growth, the growth rate of the construction industry is shifting from the high-speed growth to the medium-speed growth. To promote technological progress is an important task for the construction industry to realize the economic development mode from the extensive growth of scale and speed to the intensive growth of quality and efficiency. The contribution rate of technological progress to a large extent reflects the speed and quality of the development of the construction industry, and has reference value for understanding the development of the industry and formulating the relevant policies. The contribution rate of construction technology progress is calculated by the application of Cobb-Douglas production function model, Almon parameters estimation method and Eviews software to analyze the historical data of 2001~2012. Calculation results show that construction technical progress contribution rate has been at a low level since the beginning of this century, reflecting the construction industry technological progress is slow and lack of innovation. Especially, the capital investment of 4 trillion restrains the technological progress of construction industry to some extent.
重要日期
  • 会议日期

    12月20日

    2016

    12月21日

    2016

  • 12月13日 2016

    初稿截稿日期

  • 12月21日 2016

    注册截止日期

联系方式
  • Miss 张老师
  • 027*********
历届会议
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询