112 / 2016-12-05 22:27:32
The Research on the Renovation Method of Sheet-pile Wharf by FEA
sheet-pile wharf; dredging reconstruction; semi-covered pile; strength reduction
摘要录用
董明 / 河海大学 港口海岸与近海工程学院
In this paper, the renovation method about cast-in-place underground continuous wall and semi-covered piles on sheet-pile wharf is analyzed by using ABAQUS to establish finite element model. We can draw the following conclusions: First, the method of cast-in-place underground continuous wall can reduce the rod tension and the maximum bending moment of sheet-pile wall due to the increased penetration depth. Second, the method of semi-covered piles can reduce the soil pressure behind the sheet-pile wall because of the shelter pile’s blocking effect and the soil arching effect and it can also reduce the maximum bending moment of sheet-pile wall. The analysis of the overall stability of the semi-covered sheet-pile using the strength reduction method is carried out and the analysis shows that the sliding position will be changed and the overall stability of the pier will be greatly improved, which can be considered in design.
重要日期
  • 会议日期

    12月20日

    2016

    12月21日

    2016

  • 12月13日 2016

    初稿截稿日期

  • 12月21日 2016

    注册截止日期

联系方式
  • Miss 张老师
  • 027*********
历届会议
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询