AI-Based Multi-Step Source-Term Estimation for Nuclear Emergency Decision Support: A Comparative Assessment of GRU and PatchTST
编号:60 访问权限:仅限参会人 更新:2026-10-23 18:35:54 浏览:13次 口头报告

报告开始:暂无开始时间(Asia/Shanghai)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

演示文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
Protective-action decisions in the first hours of a nuclear power plant accident, such as sheltering, evacuation and iodine prophylaxis, depend on atmospheric dispersion forecasts, which in turn depend on an estimate of the source term. When in-plant instrumentation is lost, as at Chernobyl and Fukushima Daiichi, the source term must be reconstructed from off-site measurements, and classical inversion methods that need thousands of forward-model runs are often too slow for real-time decision support. This study assesses two structurally different neural networks, a Gated Recurrent Unit (GRU) and a Patch Time Series Transformer (PatchTST), as fast surrogates that forecast the release rate over the next six hours from a five-sensor downwind network. A corrected Gaussian plume model (GPM+) with wind-profile correction, Pasquill–Gifford stability classes, wet and dry deposition and radioactive decay generates 16,000 synthetic release scenarios per case. Each machine learning model receives 14 input features and is tested with a 24 hr and a 48 hr input window, with hyperparameters tuned by Optuna and results averaged over three seeds. With the 48 hr window, the two models are equally accurate (Log10RMSE 0.212 for GRU, 0.215 for PatchTST), but PatchTST has 31% fewer parameters and about 8.4 times lower CPU latency. With the 24 hr window GRU is more accurate (0.153 versus 0.173) but larger and slower. Both models outperform an idealized persistence baseline, which is given the true simulated release rate rather than an estimate of it, from the t+3 horizon onward, and 90.4–94.1% of forecasts fall within a factor of two of the true release rate. Because both networks require a complete input window before they can issue a forecast, the first forecast is only available 24 or 48 hr after monitoring begins; the results indicate how model choice can be matched to the accuracy, computing and timing constraints of an emergency decision-support system.
关键词
暂无
报告人
Qaisar Nadeem
Lecturer Pakistan Institute of Engineering & Applied Sciences

稿件作者
Qaisar Nadeem Pakistan Institute of Engineering & Applied Sciences
Momina Mushtaq Pakistan Institute of Engineering & Applied Sciences
Masroor Ahmed Pakistan Institute of Engineering & Applied Sciences
Amjad Farooq , Pakistan Institute of Engineering & Applied Sciences
Bilal Ahmad Khan , Pakistan Institute of Engineering & Applied Sciences
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    10月30日

    2026

    至

    11月01日

    2026

  • 09月30日 2026

    初稿截稿日期

主办单位
Harbin Engineering University
State Key Laboratory of Marine Thermal Energy and Power
Heilongjiang Nuclear Society
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询