98 / 2024-04-19 21:35:42
Single machine scheduling in additive manufacturing with two-dimensional packing constraints
Additive manufacturing,scheduling,combinatorial Benders decomposition
摘要待审
MaoZhaofang / Tianjin University
FuEnyuan / Tianjin University
HuangDian / Tianjin University
FangKan / Tianjin University
ChenLin / Zhejiang University
This paper addresses a single-machine scheduling problem in additive manufacturing (AM). We focus on the direct metal laser sintering (DMLS) technology of an AM process, where parts can be produced simultaneously in a batch. In this problem, we consider simultaneously the assignment of parts to batches and the packing of parts onto two-dimensional surfaces of the build chamber to minimize the makespan objective. To solve this problem, a mixed integer linear programming model is formulated, and an approximation algorithm is proposed, followed by an exact algorithm based on combinatorial Benders decomposition method with various Benders cuts and acceleration strategies (Algorithm CBD). Finally, we conduct a comprehensive computational study to verify the efficiency of our proposed Algorithm CBD. The computational results show that our proposed Algorithm CBD can effectively solve the test instances with different sizes.

 
重要日期
  • 会议日期

    06月28日

    2024

    07月01日

    2024

  • 07月01日 2024

    注册截止日期

主办单位
中国科学技术大学
协办单位
管理科学与工程学会
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询