Critical Chain Project Buffer Sizing Based on Capabilities Attributes
critical chain project management; buffer sizing; human resources; capabilities attributes; entropy weighted TOPSIS
全文待审
ZhangJunguang / University of Science and Technology Beijing
GuoShanshan / University of Science and Technology Beijing
To complement the current buffer determination studies that do not distinguish between differences in employees' capabilities, and to adequately consider the influence of human resources on buffer sizing, a buffer sizing method that considers employees' capabilities attributes is proposed. Firstly, the formulae of four employee subjective and objective capabilities factors, namely, procrastination degree, work intensity, multitasking capability and skill level, are proposed; secondly, the entropy-weight-TOPSIS method is used to determine the weights of the four indicators and calculate the capabilities attribute coefficients of employees on each activity; then, the activity safety time is extracted based on the capabilities attribute coefficients and the buffer size is determined based on the central limit theorem; finally, Monte Carlo simulation is conducted. Comparing the proposed method with the cut and paste method and the root square error method, the simulation results show that the proposed method can improve the project completion rate while reducing the buffer size and decreasing the project duration.
重要日期
  • 会议日期

    06月28日

    2024

    07月01日

    2024

  • 07月01日 2024

    注册截止日期

主办单位
中国科学技术大学
协办单位
管理科学与工程学会
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询