508 / 2024-06-05 21:49:37
Evolution Mechanism of the River Channel and Sandbars at the Jingjiang Reach of the Yangtze River under the New Conditions of Water and Sediment
Three Gorges Reservoir,Jingjiang River,Sandbar,River channel,Evolution mechanism
全文录用
Guanglei DUAN / Bureau of Hydrology; Changjiang Water Resources Commission
Yanbo PENG / Bureau of Hydrology;Jingjiang Bureau of Hydrology and Water Resource Survey;Changjiang Water Resources Commssion
Yun MOU / Bureau of Hydrology;Changjiang Water Resources Commission
The impoundment of the Three Gorges Reservoir (TGR) has changed the characteristics of water and sediment transport in the downstream channel after the impoundment of TGR. Based on the latest measured hydrological data and prototype channel observation data, we analyzed the evolution characteristics and mechanism of the river channel and sandbars at the Jingjiang River after the impoundment of TGR. Results indicate the following: ①The suspended load concentration was largely decreased and the riverbed was eroded observably at the Jingjiang River after the impoundment of TGR. ②The low channel was eroded deeply and the water lever in the dry season drastically dropped after the impoundment of TGR. ③Many sandbars had shrunk and the most branches were deposited at the Jingjiang River in the past twenty years.④The changing of the water and sediment transport was the main influencing factor on evolution of the river channel and sandbars after the impoundment of TGR. ⑤The human activities such as the river sand excavation and the construction of the channel improvement project had greatly influenced on evolution of the river channel and sandbars at the Jingjiang River in the past twenty years. 

 
重要日期
  • 会议日期

    10月14日

    2024

    10月17日

    2024

  • 09月30日 2024

    初稿截稿日期

  • 10月17日 2024

    注册截止日期

主办单位
国际水利与环境工程学会亚太地区分会
承办单位
长江水利委员会长江科学院
四川大学
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询