156 / 2024-02-23 08:05:49
Long-term dynamics and limits of the Yellow River water resources: Insights from sedimentary records and water balance modeling
Yellow River,sedimentary architectures,climate change,water resources
摘要录用
念念 范 / 四川大学
The Yellow River is the second longest river in China and once the largest sediment delivery river in the world. The upper reaches contribute ~60% of the total runoff, however, the Hetao Basin, which locates in the lowest section of the upper reaches, is the driest area in the Yellow River catchment. From the analysis of sedimentary architectures spanning the past 500 thousand years in the Hetao Basin, we reveal that during the dry and cold period, the upper Yellow River turned to be an inland river, which could not flow out of the Hetao Basin, as a result, tail-end lakes were formed. The area of the tail-end lakes of the upper Yellow River in the Hetao Basin fluctuated from 5, 300 km2 to 34, 000 km2, primarily influenced by the climate conditions. Using the water balance model, we reconstructed the upper and lower limits of hundred-year averaged annual runoff for the upstream Yellow River during the past 500 thousand years, the upper limit is ~280×108 m3 around 128 thousand years ago, closely resembling the present gauged data and the lower limit is only ~76×108 m3 about 18 thousand year ago, less than 30% of the present value. This study provides valuable insights into the long-term water resource dynamics of the Yellow River over a million-year time scale, offering significant benefits to theoretical research and long-term river planning.

 
重要日期
  • 会议日期

    10月14日

    2024

    10月17日

    2024

  • 09月30日 2024

    初稿截稿日期

  • 10月17日 2024

    注册截止日期

主办单位
国际水利与环境工程学会亚太地区分会
承办单位
长江水利委员会长江科学院
四川大学
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询