A Two-Stage Distributed Robust Optimization Dispatching Method for Coal Mine Integrated Energy System Considering P2G
renewable energy,coal mine integrated systems,uncertainty analysis,imprecise dirichlet model,distributed robust optimization
摘要录用
孝天 费 / 中国矿业大学信息与控制工程学院
勇 张 / 中国矿业大学信息与控制工程学院
荷娟 胡 / 中国矿业大学信息与控制工程学院
敦卫 巩 / 青岛科技大学自动化与电子工程学院
晓燕 孙 / 中国矿业大学信息与控制工程学院
Considering the needs of coal mining enterprises for energy conservation and emission reduction, as well as the demand for increasing the utilization ratio of renewable energy in the coal mine integrated energy systems, while also taking into account the impact of the uncertainty of mine-derived energy and renewable energy, a distributed robust optimization dispatching method for the coal mine integrated energy systems based on the Imprecise Dirichlet model is proposed.Firstly, consider the waste of renewable energy, the power-to-gas device is added to the traditional energy system to convert excess renewable energy into natural gas, enhancing the utilization rate of renewable energy sources.Secondly, the distributed robust method is used to express the uncertainty of mine-derived energy and renewable energy, and the fuzzy set containing the true distribution of mine-derived energy and renewable energy is constructed from the historical data by the Imprecise Dirichlet model, and then the interval expression of the output power satisfying a certain degree of confidence is obtained to construct the distributed robust optimization model of the coal mine integrated energy system. Finally, the column and constraint generation (C&CG) algorithm is used to solve the model, and the effectiveness of the model is verified by a coal mine in Shanxi Province.
重要日期
  • 会议日期

    05月29日

    2024

    06月01日

    2024

  • 05月08日 2024

    初稿截稿日期

主办单位
中国矿业大学
历届会议
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询