A Testing of Feeder Automation Model Based on the DIgSILENT Simulation Platform
编号:49 访问权限:仅限参会人 更新:2022-08-11 13:30:39 浏览:266次 张贴报告

报告开始:2022年11月04日 15:45(Asia/Shanghai)

报告时间:15min

所在会场:[S] Power System and Automation [PS8] Poster Session 8

演示文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
Facing the actuaFacing the actual distribution network of Yaozhou-Ⅰ line in JiBei power grid in China, using the DIgSILENT simulation platform, a distribution network model of 10kV Yaozhou-Ⅰ line based on the self-adaptive integrated feeder automation mode was built. In this distribution network model, segment switches, circuit breakers and connect switches cooperate with each other to achieve the tasks of Fault Location, Isolation and Service Restoration (FLISR). And in the power grid fault test, the example simulates the automatic action logic of the feeder when a three-phase or two-phase short-circuit fault occurs in a certain line to test the practicability of the model.l distribution network of Yaozhou-Ⅰ line in JiBei power grid in China, using the DIgSILENT simulation platform, a distribution network model of 10kV Yaozhou-Ⅰ line based on the self-adaptive integrated feeder automation mode was built. In this distribution network model, segment switches, circuit breakers and connect switches cooperate with each other to achieve the tasks of Fault Location, Isolation and Service Restoration (FLISR). And in the power grid fault test, the example simulates the automatic action logic of the feeder when a three-phase or two-phase short-circuit fault occurs in a certain line to test the practicability of the model.
关键词
暂无
报告人
Bowen Liu
North China Electric Power University

稿件作者
Bowen Liu North China Electric Power University
Xu Zhang North China Electric Power University
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    11月03日

    2022

    11月05日

    2022

  • 08月01日 2022

    初稿截稿日期

  • 11月04日 2022

    注册截止日期

  • 11月05日 2022

    报告提交截止日期

主办单位
Huazhong University of Science and Technology
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询