Optimum infrastructure maintenance scheduling model for urban rail transit considering possession conflict resolution
编号:966 访问权限:仅限参会人 更新:2021-12-03 10:33:15 浏览:79次 张贴报告

报告开始:2021年12月17日 08:33(Asia/Shanghai)

报告时间:1min

所在会场:[P1] Poster2020 [P1T6] Track 6 Future Transportation and Modern Logistics

暂无文件

摘要
The infrastructure systems of urban rail transit are critically important for the safety and stability of train operations. Efficient maintenance on systems requires appropriate allocation of possession times and resources within the limited duration and complicated constraints. An integer programming model is proposed for long-term maintenance scheduling on multi-major systems. Maintenance activities are classified into routine tasks and projects due to their execution cycle, possession duration and influence range. A possession duration indicator is introduced as constraint for the resolution of the time and space possession conflicts. The proposed model aims to minimize the total maintenance cost and penalty cost by arranging maintenance activities on each segment in discrete time periods. The clustered maintenance is applied for the reduction on cost. The results from case study verify the practicability and availability of the proposed model, which is able to provide decision support for long-term maintenance scheduling in urban rail transit systems.
关键词
CICTP
报告人
Gehui LIU
School of Traffic and Transportation, Beijing Jiaotong University

稿件作者
Gehui LIU School of Traffic and Transportation, Beijing Jiaotong University
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    12月17日

    2021

    12月20日

    2021

  • 12月16日 2021

    报告提交截止日期

  • 12月24日 2021

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Chang'an University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询