Research on Control Index of Interval Excavation Construction of Marl Slope
编号:780 访问权限:仅限参会人 更新:2021-12-03 10:29:13 浏览:103次 张贴报告

报告开始:2021年12月18日 21:10(Asia/Shanghai)

报告时间:15min

所在会场:[T2] Track II Transportation Infrastructure Engineering [S2-4] Simulation and Characterization on Transportation Materials

暂无文件

摘要
In order to improve the sliding phenomenon of interval excavation construction of marl slope in highway engineering, the importance of influencing factors of interval excavation is determined by comparative analysis. Firstly, the sliding mechanism of interval excavation is carried out. The analysis mainly optimizes the slope angle, slope height and soil quality of the main influencing factors. Then, using the ABAQUS finite element programs software, the interval excavation process of different soil, slope foot and slope height and the excavation of the slope surface and slope. The plastic deformation zone and displacement of the slope foot was simulated and analyzed. The results showed that the soil strength decreased and the slope height increased within a certain range. The interval excavation size should be reduced. Therefore, in order to avoid mud The problem of soil quality, slope angle and slope height should be considered in the occurrence of the problem of unloading and rainfall caused by limestone slope excavation and the instability of the slope.
关键词
CICTP
报告人
Zhizhong Zhao
Shandong Jiaotong University

稿件作者
Zhizhong Zhao Shandong Jiaotong University
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    12月17日

    2021

    12月20日

    2021

  • 12月16日 2021

    报告提交截止日期

  • 12月24日 2021

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Chang'an University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询