Study on Post Evaluation method of Highway Asphalt pavement Preventive maintenance Engineering
编号:769 访问权限:仅限参会人 更新:2021-12-03 10:28:59 浏览:140次 张贴报告

报告开始:2021年12月18日 23:55(Asia/Shanghai)

报告时间:15min

所在会场:[T2] Track II Transportation Infrastructure Engineering [S2-4] Simulation and Characterization on Transportation Materials

暂无文件

摘要
The post-evaluation of highway preventive maintenance engineering can test the quality of preventive maintenance project, on the other hand and also can evaluate the technical, economic and environmental effects of preventive maintenance engineering, sum up experience, draw lessons, and provide reference significance for follow-up preventive maintenance engineering. Taking the preventive maintenance project of expressway in Shandong Province for five years as the research object, the database of pavement assets is established, including the pavement structure, traffic volume, maintenance history and road condition detection data of preventive maintenance project for 5 consecutive years. From three aspects of technology, economic and social effect and environmental impact, the corresponding post-evaluation model is established to evaluate the implementation effect of preventive maintenance engineering, to determine the best maintenance time of preventive maintenance measures, and to provide theoretical basis for the scientific implementation of preventive maintenance engineering.
关键词
CICTP
报告人
Jie Zhu
China Academy of Transportation Sciences

稿件作者
Jie Zhu China Academy of Transportation Sciences
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    12月17日

    2021

    12月20日

    2021

  • 12月16日 2021

    报告提交截止日期

  • 12月24日 2021

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Chang'an University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询