Study on the Length of Upstream Transition Section in Reconstruction and Expansion Area of Secondary Highway
编号:1927 访问权限:仅限参会人 更新:2021-12-03 14:42:50 浏览:111次 张贴报告

报告开始:2021年12月17日 08:47(Asia/Shanghai)

报告时间:1min

所在会场:[P2] Poster2021 [P2T4] Track 4 Transportation Behavior, Safety and Security

演示文件 附属文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
The length of the upstream transition area in the construction area during the highway reconstruction and expansion period has an important impact on the operation of road traffic flow and the construction operation area. The simulation model of the operation area is established by Vissim simulation software, and the impact of non-motor vehicles is taken into account. The average number of stops, average queue length, and average travel delay are used as evaluation indicators for the optimal length of the upstream transition area. A combination of analytic hierarchy process and gray correlation method is used for multi-index evaluation. According to the evaluation results, the recommended value of the optimal length of the upstream transition area is obtained.
关键词
CICTP
报告人
Guangyu Chen
Chang'an University

稿件作者
Guangyu Chen Chang'an University
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    12月17日

    2021

    12月20日

    2021

  • 12月16日 2021

    报告提交截止日期

  • 12月24日 2021

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Chang'an University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询