Study on the Configuration of Transfer Facilities in Integrated Passenger Transport Hub
编号:1879 访问权限:仅限参会人 更新:2021-12-03 14:41:46 浏览:111次 张贴报告

报告开始:2021年12月17日 08:26(Asia/Shanghai)

报告时间:1min

所在会场:[P2] Poster2021 [P2T3] Track 3 Transportation Planning and Policy

暂无文件

摘要
In this study, existing standards for station construction and related research are analyzed. The requirement of station construction is cleared. On the basis of the analysis of passenger transfer behaviors in integrated passenger transport hub, the configuration requirement of the transfer facilities is proposed. A new model is developed to determine the scale of transfer facilities, including passenger transfer squares, transfer halls, transfer channels and other transfer facilities. The proposed method is designed to match the capability and function of transfer facilities according to the development demand of integrated passenger transport hub. A general formula is provided in this study to be readily applied to a generalized integrated passenger transport hub.
关键词
CICTP
报告人
Weiqing Zheng
China Academy of Transportation Sciences

稿件作者
Weiqing Zheng China Academy of Transportation Sciences
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    12月17日

    2021

    12月20日

    2021

  • 12月16日 2021

    报告提交截止日期

  • 12月24日 2021

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Chang'an University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询