Ice covering on the lining surface seriously threaten traffic safety in cold region tunnels. The paper summarized the main types of icing problems in tunnels and analyzed the reason for leakage and icing, subsequently, corresponding countermeasures were proposed. Firstly, the waterproof board suffers from vertical damage and shear damage, the drainage system was blocked by sediment and karst deposition, polyurethane insulation layer was extruded and immersed in water resulting in failure, were proposed to reveal the reason of leakage and icing during operation. Secondly, to deal with these problems, the waterproof layer of the sprayed membrane was put forward to dealing with the durability of waterproof layer. And a maintainable drainage system, which includes the tiled laying method of the waterproof layer and a maintainable drain pipe laying method was presented to deal with the problem of drainage system blockage and maintenance. And, it is not recommended to set the thermal insulation layer between the primary support and the secondary lining. The electric heat trace system and geothermal energy combined with the thermal insulation layer could be used against icing behind the lining. Finally, the microwave deicing technology technical and deicing and drainage method of joint was introduced to deal with the icing. It is hoped that the countermeasure could improve the prevention of freezing damage.
关键词
CICTP
报告人
Peng XU
Central South University

稿件作者
Peng XU Central South University
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    12月17日

    2021

    12月20日

    2021

  • 12月16日 2021

    报告提交截止日期

  • 12月24日 2021

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Chang'an University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询