Research on the limit scale estimation method of regional highway infrastructure
编号:1084 访问权限:仅限参会人 更新:2021-12-03 10:35:57 浏览:82次 张贴报告

报告开始:2021年12月17日 08:13(Asia/Shanghai)

报告时间:1min

所在会场:[P2] Poster2021 [P2T5] Track 5 Highway and Railway Engineering

演示文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
The construction of transportation infrastructure is not only the foundation of regional survival and development, but also the important foundation of realizing regional functional orientation and improving regional comprehensive competitiveness. The rational allocation of traffic land resources requires the prediction of the limit scale of transportation infrastructure. Through the combination of qualitative analysis, quantitative evaluation and empirical research, a theoretical calculation model for predicting the land scale of highway traffic infrastructure construction based on RR-ARIMA coupling model is proposed. Taking Shandong Province as an example, the total limit scale of regional highway traffic infrastructure from 2022 to 2025 is predicted, and it is concluded that the limit scale of highway infrastructure at the end of the 14th five-year Plan is 79.99-91.58 ten thousand hectares.
关键词
CICTP
报告人
Bing Zhao
Transportation Planning and Design Research Center, Shandong University

稿件作者
Bing Zhao Transportation Planning and Design Research Center, Shandong University
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    12月17日

    2021

    12月20日

    2021

  • 12月16日 2021

    报告提交截止日期

  • 12月24日 2021

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Chang'an University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询