Utilization of Mine Water Resources in Eastern Australia – Managing Water in Open Pit Mines in a Watershed Context
编号:297 访问权限:仅限参会人 更新:2022-05-13 10:41:25 浏览:571次 特邀报告

报告开始:2022年05月27日 10:00(Asia/Shanghai)

报告时间:20min

所在会场:[S1] Resource Development and Utilization [S1-2] Resource Development and Utilization-2

暂无文件

摘要
Utilization of mine water resources and managing water in open pit mines is increasingly important in water-stressed areas. This paper aims to review information and present new data and discussion on water that is utilized during mining of black coal and brown coal in Eastern Australia. Coal from underground and open pit mines is produced for export and generation of electricity in the Australian National Electricity Market (NEM). Utilization of mine water resources in this context refers to water that is extracted or seeps into a mine void, water that is used by mine operations, or water that is available from the mine to be utilized for other uses (e.g. for irrigation), either during mine operation or after closure during mine site rehabilitation. Trends of water utilization over recent years with primary energy generation will be presented, along with associated water utilization for coal at NEM scale, and for selected mine sites. Challenges for management of water resources in a catchment (watershed) context are considered, particularly open pit mines that are located on floodplains, with increased large rainfall events, and reduced water availability over the long-term due to climate change. Rehabilitation options for open pits after mine closure typically favor pit lakes for various beneficial uses, however, deficits of available water mean that it may take decades to hundreds of years for hydraulic equilibrium. Examples are presented of small to large pit scales (35-2000 hectare pit areas, with <20, 20-1000 and >1000 Gigalitre volumes). The goals of safe, stable and sustainable management of open pits requires reliable models of potential hazards of pit interactions with aquifers, wetlands and rivers.    
 
关键词
open pit mine,water,rehabilitation,watershed
报告人
Wendy Timms
Deakin University

稿件作者
Wendy Timms Deakin University
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    05月26日

    2022

    05月27日

    2022

  • 05月03日 2022

    初稿截稿日期

  • 05月26日 2022

    报告提交截止日期

  • 05月28日 2022

    注册截止日期

主办单位
中国矿业大学
联系方式
历届会议
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询