Maximum output cleaning-cycle optimization at a 20 MW solar-power plant
编号:264 访问权限:仅限参会人 更新:2022-04-19 18:29:37 浏览:379次 口头报告

报告开始:暂无开始时间(Asia/Shanghai)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

暂无文件

摘要
In recent years, photovoltaic (PV)- power plant has increased markedly. The dust-caused loss of a 20 MW(p) PV power plant, located in the Baicheng area, was analyzed. The power generation data show that dust-caused power-loss has a linear dependency with dust deposition. A cleanliness management model is used to find the optimal cleaning-cycle to produce maximum output-power. The results show that, when the average light intensity is 260W/m2, the 500kW array produces the maximum economic output per unit time, using mechanical cleaning and a cleaning cycle of 2.9 d, so as the 20 MW(p) PV power plant. For a 20MW solar PV power plant, the yearly income can increase RMB 1.32 million by selecting the optimized cleaning cycle.
关键词
PV modules, dust deposition, maximum output cleaning -cycle, economic analysis
报告人
庆禄 孔
东北电力大学

稿件作者
宏伟 曲 东北电力大学
庆禄 孔 东北电力大学
志明 徐 东北电力大学
虎 王 中国大唐集团科学技术研究院有限公司
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    05月26日

    2022

    05月27日

    2022

  • 05月03日 2022

    初稿截稿日期

  • 05月26日 2022

    报告提交截止日期

  • 05月28日 2022

    注册截止日期

主办单位
中国矿业大学
联系方式
历届会议
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询