Electric-thermal energy storage configuration of regional integrated energy system based on wind power prediction
编号:63 访问权限:仅限参会人 更新:2020-10-28 15:20:18 浏览:276次 口头报告

报告开始:2020年11月02日 14:30(Asia/Shanghai)

报告时间:20min

所在会场:[G] Power System 2 [G] Power System

视频 无权播放 演示文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
In order to solve the problem of integrated energy/thermal energy storage configuration, a regional integrated energy system power/thermal energy storage configuration method based on wind power prediction is proposed. First of all, a dynamic neural network prediction model of wind power prediction is constructed to effectively predict the power of wind farms in regional integrated energy systems. Then, the behavior of charging and releasing energy from regional integrated energy system is analyzed, the connection between power storage, heat storage and regional wind farm power is established, and the electric coupling relationship is considered to form a joint optimization configuration model of electric/thermal energy storage. Finally, select the actual data of a certain place, set up three scenarios, the prediction results are substituted into the optimization model to calculate the power storage and heat storage configuration, and the comparison verifies that the wind power prediction under this method has a good effect, which is conducive to the optimal allocation of energy storage resources and reduce costs.
 
关键词
regional integrated energy system,Wind Power Forecasting,dynamic neural network,electric/thermal energy storage,joint optimization configuration,mixed integer planning
报告人
Yizong Guo
College of electrical engineering; Zhejiang University

Chutong Wang
College of electrical engineering, Zhejiang University

稿件作者
Yizong Guo College of electrical engineering; Zhejiang University
Bo Yang Inegrated Energy Tchnician Planning and Research Center of Guangzhou
Jun Pan Inegrated Energy Tchnician Planning and Research Center of Guangzhou
Yishun Zhu Inegrated Energy Tchnician Planning and Research Center of Guangzhou
Xurui Huang Inegrated Energy Tchnician Planning and Research Center of Guangzhou
Xing Zhang Inegrated Energy Tchnician Planning and Research Center of Guangzhou
Chuangxin Guo College of electrical engineering, Zhejiang University
Chutong Wang College of electrical engineering, Zhejiang University
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    11月02日

    2020

    11月04日

    2020

  • 10月27日 2020

    初稿截稿日期

  • 11月03日 2020

    报告提交截止日期

  • 11月04日 2020

    注册截止日期

  • 11月17日 2020

    终稿截稿日期

主办单位
IEEE IAS Student Chapter of Huazhong University of Science and Technology (HUST)
承办单位
Huazhong University of Science and Technology
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询