1192 / 2020-09-29 17:52:02
The Development of Jiangsu Power Grid in 2016-2020
Jiangsu power grid,power grid statistics,proposal,social power consumption
终稿
Zhongxi Liu / Jiangsu Keneng Power Engineering Consulting Co., Ltd.
Hao Tian / Jiangsu Keneng Power Engineering Consulting Co., Ltd.
In the past five years, Jiangsu power grid has formed a "six verticals and six horizontals" transmission grid. At the same time, social power consumption and the installed capacity of 220kV and above transformers continues to reach new heights. In this paper, we analyze the achievements of Jiangsu power grid in the past five years, combine with the power grid statistics such as social power consumption and dispatching power in Jiangsu. Based on these statistics, we try to analyze the development trend of Jiangsu power grid. Finally, we point out a few hidden trouble of Jiangsu power grid, and provide appropriate proposals for the development plan of the next few years.
重要日期
  • 会议日期

    11月02日

    2020

    11月04日

    2020

  • 10月27日 2020

    初稿截稿日期

  • 11月03日 2020

    报告提交截止日期

  • 11月04日 2020

    注册截止日期

  • 11月17日 2020

    终稿截稿日期

主办单位
IEEE IAS Student Chapter of Huazhong University of Science and Technology (HUST)
承办单位
Huazhong University of Science and Technology
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询