445 / 2018-12-30 16:38:39
Optimization of Startup Process of Turbine in Combined Cycle Unit
Gas-steam combined cycle, Emission reduction, Finite element method
终稿
Liu Sheng-long / Zhejiang University
Wang Xiaorong / Zhejiang Energy Xiaoshan Power Plant
Chen Qiangfeng / Zhejiang Energy Xiaoshan Power Plant
Wu Wenjian / Zhejiang Electric Power Research Institute
Chen Jianhong / Zhejiang University
Sheng Deren / Zhejiang University
During the startup process of gas-steam combined cycle unit, compared with the gas turbine, the steam turbine spends longer time starting up, and that leads to additional energy waste and environmental pollution. It also makes it difficult for the unit to respond quickly to the need for power grid peak shaving. Based on this, this paper takes a combined cycle unit as the research object and analyzes the shortage of the original startup process, and then proposes an optimization scheme. First, the thermal stress of the turbine rotor is calculated by the finite element method during the original starting process. Then, under the premise of not increasing the maximum stress and not reducing the safety margin, the start-up process is optimized. The improved startup method can shorten the startup time of the unit, and has obvious economic and environmental benefits. To be specific, it can save electricity by 4900MWh and reduce NOx emissions by 1500kg per year.
重要日期
  • 会议日期

    10月21日

    2019

    10月25日

    2019

  • 10月20日 2019

    初稿截稿日期

  • 10月25日 2019

    注册截止日期

承办单位
浙江大学
昆明理工大学
联系方式
历届会议
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询