63 / 2019-07-23 12:28:55
Application of the ERT and TSP303 methods for detection fracture zones ahead of tunnel: A case study
Tunnel Seismic Prediction,Electrical Resistivity Tomography,Seismic Wave,Velocity Analysis,Low Velocity Zones
全文待审
The purpose of this study is to investigate about the geological properties ahead of a tunnel face with using Electrical Resistivity Tomography ERT and Tunnel Seismic Prediction TSP303 methods. In deep tunnels with hydro-geological conditions, it is important to study the geological structures of the region before excavating tunnels. Otherwise, it would lead to unexpected accidents that impose serious damage to the project. For constructing Nosoud tunnel in west of Iran, the ERT and TSP303 methods are employed to predict the geological conditions dynamically during the excavation. In this paper, based on the engineering background of Nosoud tunnel, the important results of applying these methods are discussed. This work demonstrates seismic method and electrical tomography as two geophysical techniques that are able to detect a tunnel. The results of these two methods were being in agreement with each other but the results of TSP303 are more accurate and quality. In this case, the TSP 303 method was a useful tool for predicting unstable geological structures ahead of the tunnel face during excavation. Thus, using another geophysical method together with TSP303 could be helpful as a decision support in excavating, especially in complicated geological conditions.
重要日期
  • 会议日期

    08月24日

    2019

    08月25日

    2019

  • 06月15日 2019

    摘要录用通知日期

  • 07月30日 2019

    初稿录用通知日期

  • 07月31日 2019

    摘要截稿日期

  • 07月31日 2019

    初稿截稿日期

  • 08月15日 2019

    终稿截稿日期

  • 08月25日 2019

    注册截止日期

承办单位
教育部长江三峡库区地质灾害研究中心
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询